Experience

Scheibe Consulting, LLC, was established in 2011 and has grown to include a group of highly qualified professionals with skills in H&H modeling, FEMA CLOMR/LOMR projects, general civil design, utility design, roadway design, navigation channel design, stable channel design, bridge/culvert design, coastal engineering, dam design, levee design, and construction services.

Scheibe staff have worked on public and private projects including:

  1. Neches Salt Water Barrier Project, Vidor, TX
  2. Sims Bayou Federal Flood Control Project, Houston, TX
  3. Addicks and Barker Reservoir CWMS Program, Houston, TX
  4. Wharton Co. Drainage Master Plan, Wharton, TX
  5. Texas City Levee Certification Project, Texas City, TX
  6. Lower Colorado River Restudy (‘Tri-County Study’), Colorado Co. to West Matagorda Bay, TX
  7. Lower Nueces River Regional Sediment Management Project, Corpus Christi, TX
  8. Nueces Bay Rookery Island Restoration Project, Corpus Christi, TX
  9. Raymondville Drain Federal Feasibility Study, Willacy Co., TX
  10. Cameron County Drainage District #5 2D Modeling Flood Protection Plan, Harlingen, TX
  11. Bahia Atascosa National Wildlife Refuge – Ecosystem Restoration Project, Brownsville, TX
  12. Guadalupe Blanco River Authority Flood Protection Planning Study, TX
  13. Hays Co. Remapping Study, TX
  14. Numerous Floodplain Studies for the City of Austin Watershed Protection Department
  15. N. and S. San Gabriel River Flood Protection Planning Study, Williamson Co., TX
  16. Nolan Creek Flood Protection Planning Study, Killeen, TX
  17. San Marcos Flood Early Warning System, San Marcos, TX
  18. Blanco Gardens Drainage Improvement Project, San Marcos, TX
  19. Mopac Roadway and Drainage Improvement Project (Slaughter to La Crosse), Austin, TX
  20. Caltrans High Speed Rail Project, Fresno, CA

Cameron County Drainage District #5 Flooding – June 2019 Event

(Scheibe RAS 2D Model Results)

Nueces Rookery Island Restoration – Island #1 Construction

(Scheibe 12/09/19)

Travisso Subdivision Dam Rehabilitation Project, Leander, TX
(Scheibe Designed and Provided Construction Phase Services – 2019)